Description
TRUF Grey Water Treatment Plant – Sustainable Water Reuse for UAE & KSA
Complete Plug-and-Play Solution
Unlike conventional systems, Triwa’s TRUF Grey Water Treatment Plant doesn’t just filter wastewater—instead, it transforms water from sinks, showers, and laundries into reusable water for irrigation, toilet flushing, and car washing. What’s more, our all-in-one system combines ultra-filtration, multi-media filters, and activated carbon polishing to meet DEWA (UAE) and SASO (KSA)standards. As a result, you get compliant, odor-free, and non-potable water with minimal maintenance.
How the TRUF System Works
-
Pre-Treatment
-
First, automatic screens remove hair, lint, and large particles.
-
-
Ultra-Filtration (UF)
-
Next, hollow-fiber membranes filter contaminants down to 0.01 microns, which means 99% removal of bacteria and turbidity.
-
-
Activated Carbon Polishing
-
Finally, carbon filters eliminate detergents, oils, and odors for crystal-clear output.
-
✅ Key Benefit: Not only is the system fully automated, but it also offers IoT monitoring options to track flow rates, filter life, and water quality remotely.
Applications & Cost Savings
Use Case | Water Quality | Savings |
---|---|---|
Landscape Irrigation | Thanks to ultra-filtration, water achieves turbidity <5 NTU and BOD <10 mg/L | Consequently, freshwater use drops by 50% |
Toilet Flushing | Because of thorough polishing, water is odor-free and pathogen-free | Therefore, sewer discharge fees fall 30% |
Car Washing | After treatment, water is oil-free with low TDS | Ultimately, you’ll use 100% recycled water |
Why Choose TRUF?
-
Fast Deployment: Unlike custom-built systems, our pre-assembled skids become operational in 24 hours.
-
Compact Design: Despite its high capacity, the system fits tight spaces (from 2.5 m²).
-
Certified Compliance: In addition to meeting DEWA standards, TRUF is SWCC-approved for Saudi Arabia.
-
Low Energy: Compared to traditional plants, it runs on <1 kW per 1,000 liters.
Technical Specifications
Model | Capacity (m³/day) | Power (kW) | Footprint (m²) |
---|---|---|---|
TRUF-5 | 5 | 1.2 | 2.5 |
TRUF-20 | 20 | 3.5 | 5.0 |
Get Your Custom Quote
-
Free site assessment
-
DEWA/SASO compliance guidance
-
Case studies from UAE/KSA projects