Skip links

Cooling Tower Dosing & Blow Down (TRIWA-X/3S-V-CABG-UK)

Cooling Tower Dosing & Blow Down (TRIWA-X/3S-V-CABG-UK)

Categories: ,

Description

General

One complete system for cooling towers – Conductivity control, Inhibitor & Dual Biocide Dosing with manifold on PVC panel – ready for installation – ready to control. The integrated TRIWA-DIGICHEM® XP2 controller, with data logging, maintains the conductivity of the tower water via its bleed solenoid valve. Corrosion Inhibitors are dosed on bleed, on a cycle or proportional to make-up. Biocide chemicals are dosed according to 10 independent 28-day timer programs. The circulating/condenser pump can be configured to automatically run during and after any biocide dosing program to ensure that the biocide mixes thoroughly.

Specification

  • Digital controller & power plugs mounted with manifold
  • On-board data logging
  • Digital controllers, power plugs & manifold mounted on PVC back panels
  • Bleed Control – via solenoid valve

  • Inhibitor Dosing – reduces corrosion
  • Dual Biocide Dosing for system disinfection
  • Primary (oxidizing) biocide dosing – ORP controlled via peristaltic pump (disabled on no-flow)
  • Secondary (non-oxidizing) biocide dosing via 10 x 28-day timer programs with Pre-bleed & Bleed Lock-out
  • Pre-wired power plugs for easy installation dosing pumps (versatile design)
  • Condenser pump override facility during secondary biocide dosing with delay-off timer
  • Fail-safe alarm relays with remote power failure detection
  • Options & variations available